The ITER project was successfully delivered.

Release date :2023-01-19

Shanghai Nagamori Machinery Co.,Ltd. TheITER 16953 project equipment includes waste storagebins、AuxiliarytrapsPressure relief box、Located inthe drainage and reinjection system and the main heat transfer system of vacuumvessel, Shenzhen CGN Engineering Design Co., Ltd. (hereinafter referred to as"CGNPC") is responsible for project execution communication anddetailed design, and forms a consortium with Senyong Co., Ltd., which isresponsible for material procurement, equipment manufacturing and in-planttesting.

In theimplementation stage of the project, in the face of repeated epidemic andlockdown in Shanghai, external environmental constraints such as "dualcontrol" power rationing of energy consumption, as well as the difficultyof equipment manufacturing, inspection and testing, all employees of NAGAMORIworked together to overcome all difficulties and work together to ensure theprogress of the project and the needs of customers and owners, highlighting NAGAMORI'sexcellent manufacturing level, excellent management level and proactive serviceattitude for customers.


国产日韩欧美成人_亚洲日韩精品无码久久_天天综合色天天综合网_中文字幕无码久久人妻资讯_国产成版人视频网站免费下_亚洲人成网线在线播放不卡_国产欧美日韩精品区一区二区_久久这里只有精品国产免费10